LLMpediaThe first transparent, open encyclopedia generated by LLMs

Solarpark Meuro

Generated by Llama 3.3-70B
Note: This article was automatically generated by a large language model (LLM) from purely parametric knowledge (no retrieval). It may contain inaccuracies or hallucinations. This encyclopedia is part of a research project currently under review.
Article Genealogy
Parent: Power plants Hop 4
Expansion Funnel Raw 72 → Dedup 34 → NER 16 → Enqueued 13
1. Extracted72
2. After dedup34 (None)
3. After NER16 (None)
Rejected: 18 (parse: 18)
4. Enqueued13 (None)
Similarity rejected: 3
Solarpark Meuro
NameSolarpark Meuro
CountryGermany
LocationMeuro, Brandenburg
Coordinates51°45′N 13°54′E
StatusOperational
ConstructorEnerparc
OperatorEnerparc
Commission2012

Solarpark Meuro is a large photovoltaic power station located in Meuro, Brandenburg, Germany, near the cities of Cottbus and Dresden. The solar park was developed by Enerparc, a leading renewable energy company, in collaboration with Bosch Solar Energy, SMA Solar Technology, and Schüco. The project was supported by the German Federal Ministry for Economic Affairs and Energy and the European Union's European Investment Bank.

Introduction

The Solarpark Meuro project was initiated in 2010, with the aim of generating clean and sustainable energy using solar power. The park was designed to produce enough electricity to power approximately 40,000 households, reducing carbon dioxide emissions by around 120,000 tons per year. The project involved the installation of over 850,000 photovoltaic modules from manufacturers such as Trina Solar, Jinko Solar, and Hanwha Q CELLS. The solar park's construction was overseen by Belectric, a renowned engineering, procurement, and construction (EPC) company, in partnership with Goldbeck Solar and KACO new energy.

Location

The Solarpark Meuro is situated in the Meuro municipality, approximately 10 kilometers north of the city of Cottbus, in the Brandenburg state of Germany. The solar park covers an area of around 220 hectares, making it one of the largest solar farms in Europe. The location was chosen due to its high solar irradiance and proximity to the German power grid, which is operated by Tennet TSO and 50Hertz Transmission. The solar park is also near the Poland border, close to the cities of Zielona Góra and Wrocław.

Technology

The Solarpark Meuro utilizes advanced photovoltaic technology to generate electricity from solar energy. The solar park is equipped with over 850,000 monocrystalline silicon photovoltaic modules, which are mounted on tracker systems designed by Gamesa and Siemens Gamesa. The inverters used in the solar park are from manufacturers such as SMA Solar Technology, AEG Power Solutions, and Refusol. The solar park's medium-voltage electrical infrastructure was designed and installed by Nexans and Prysmian Group.

Environment

The Solarpark Meuro has been designed to minimize its environmental impact, with a focus on sustainability and conservation. The solar park's construction involved the creation of habitat restoration areas for local wildlife, such as the European rabbit and the red fox. The project also included the installation of bird-friendly power lines and towers designed by GE Renewable Energy and Vestas. The solar park's operation and maintenance activities are carried out in accordance with the European Union's Environmental Impact Assessment directive and the German Federal Nature Conservation Act.

Operations

The Solarpark Meuro has been operational since 2012, generating over 140 million kilowatt-hours of clean energy per year. The solar park is managed by Enerparc, which is responsible for its operation and maintenance, as well as monitoring and control systems. The solar park's performance is monitored using advanced scada systems from Siemens and ABB. The electricity generated by the solar park is fed into the German power grid and distributed to households and businesses by E.ON, RWE, and EnBW. The Solarpark Meuro has become a model for large-scale solar energy projects in Europe, with visitors from Renewable Energy Systems, Vattenfall, and Statoil coming to learn from its best practices. Category:Solar power stations in Germany