| Name | Project EnergyConnect |
| Type | Electricity transmission |
| Location | Australia |
| Status | Under construction / Commissioned sections |
| Length km | 900 |
| Start | South Australia |
| End | New South Wales |
| Owners | ElectraNet, TransGrid, consortium |
| Operator | ElectraNet, TransGrid |
Project EnergyConnect is a major high-voltage electricity transmission initiative linking South Australia and New South Wales via a cross-border interconnector between the National Electricity Market regions of Adelaide and Sydney. The project aims to enhance transmission capacity, support renewable energy integration from areas such as South Australia wind farms, facilitate connections to Battery of the Nation style storage concepts, and improve system resilience alongside other projects like HumeLink, Victorian Big Battery, and the Snowy 2.0 scheme. Key participants include ElectraNet, TransGrid, state energy agencies, and private investors contributing to planning, construction, and operation.
Project EnergyConnect is an interregional transmission line designed to link the Adelaide electricity supply with the Sydney network by connecting the Riverland and Darlington Point areas via high-voltage infrastructure. The initiative is part of a broader national strategy involving the Australian Energy Market Operator and the Australian Energy Regulator to facilitate large-scale integration of projects such as the Hornsdale Power Reserve, Bungala Solar Farm, and Blimpied Wind Farm. It complements national planning documents like the Integrated System Plan (Australia) and aligns with state policies from the Government of South Australia and the Government of New South Wales. Stakeholders include transmission businesses similar to AusNet Services and Powerlink Queensland, market bodies such as the Australian Energy Market Commission, and investors including superannuation funds associated with IFM Investors and Macquarie Group.
The route traverses diverse geographic and administrative areas, commencing near Robertstown, South Australia and terminating close to Wagga Wagga and TransGrid network nodes near Darlington Point, New South Wales, with a corridor potentially intersecting the Murray River basin and the Riverina. Construction involves transmission towers, underground cables in sensitive sections, switching stations like those comparable to Tailem Bend substation or Tumbarumba substation, and converter sites for synchronous or asynchronous interconnection technologies used in projects such as Victorian Renewable Energy Target installations. The corridor crosses or interacts with landholders associated with Commonwealth lands and state-managed reserves including areas near the Murray-Darling Basin Authority jurisdiction, requiring coordination with entities like the NSW Department of Planning and Environment and the SA Department for Energy and Mining.
The scheme employs high-voltage alternating current (HVAC) or high-voltage direct current (HVDC) designs similar to those used on the Basslink and Directlink interconnectors, with nominal voltages proposed in the 330 kV to 500 kV range and conductor technology influenced by international suppliers such as Siemens, GE Grid Solutions, and ABB. Capacity targets aim to enable hundreds of megawatts to gigawatt-scale transfers comparable to interfaces like the Victoria–New South Wales interconnector and protections coordinated through systems like Power System Security frameworks operated by the Australian Energy Market Operator. Grid integration includes dynamic frequency control, synchronous condensers analogous to those installed for Snowy Hydro upgrades, and network control centers modeled on AEMO control room operations.
Origins trace to regional planning discussions involving the Australian Energy Market Operator and policy statements from the Council of Australian Governments and state cabinets in the 2010s, progressing through regulatory assessments by the Australian Energy Regulator and environmental approvals influenced by cases heard before tribunals similar to the Land and Environment Court of New South Wales. Major milestones include planning approvals, contracts awarded to consortiums resembling partnerships of Sommerset Group style contractors and international engineering firms, and construction phases overseen by transmission owners like ElectraNet and TransGrid. The timeline intersects with other transformative works such as the HumeLink and the South Australian Renewable Energy Plan, with community consultations involving organizations like the National Farmers' Federation and regional councils including Mid Murray Council.
Assessments examined effects on habitats linked to the Murray Mallee and Riverina ecosystems, impacts on species protected under the Environment Protection and Biodiversity Conservation Act 1999 and requirements from agencies like the Department of Agriculture, Water and the Environment. Social impacts addressed land access, Indigenous heritage concerns involving Aboriginal land councils such as the Ngarrindjeri Regional Authority and NSW Aboriginal Land Council, and economic benefits for regional towns like Renmark and Griffith. Mitigation measures mirror practices used in projects like the Bungala Solar Farm and involve offsets, community benefit schemes administered with local governments, and route adjustments to limit effects on conservation reserves such as those managed by the National Parks and Wildlife Service (New South Wales).
Funding combines equity from transmission owners including ElectraNet and TransGrid, debt arranged via institutional lenders such as the Clean Energy Finance Corporation and commercial banks like ANZ and Commonwealth Bank of Australia, and potential capital from infrastructure investors comparable to QIC or Macquarie Infrastructure and Real Assets. Regulatory revenue determinations were considered by the Australian Energy Regulator, while commercial agreements include participation from generators such as AGL Energy, Origin Energy, Engie, and service providers like Downer Group and Monadelphous. Stakeholder engagement involves state departments, local councils, First Nations groups, and market institutions such as the Australian Energy Market Commission.
Once commissioned, operation will be coordinated by ElectraNet and TransGrid in conjunction with the Australian Energy Market Operator, enabling flows that support projects like Snowy 2.0 and regional storage hubs akin to the Big Battery Victoria. Future enhancements may include capacity upgrades, additional converter stations reflecting HVDC expansion seen in Marinus Link proposals, and integration with transmission augmentation programs promoted by the Integrated System Plan (Australia). Long-term outcomes aim for increased reliability for consumers in Adelaide and Sydney, stronger pathways for renewables developed in regions like the Riverland and Riverina, and alignment with national decarbonisation goals endorsed by federal policies and stakeholders including state premiers and energy ministers.