Kárahnjúkar Hydropower Plant
NameKárahnjúkar Hydropower Plant
CountryIceland
LocationEastern Region
Coordinates64, 56, N, 15...
Construction began2003
Opening2007
OwnerLandsvirkjun
OperatorLandsvirkjun
TypeConventional
Turbine manufacturerAndritz
Ps electrical capacity690 MW
Ps annual generation4,600 GWh

Kárahnjúkar Hydropower Plant is a major hydroelectric power station located in the remote highlands of eastern Iceland. Constructed by the national power company Landsvirkjun, it is the largest of its kind in the country and was built primarily to provide electricity for a new aluminium smelter operated by Alcoa in Reyðarfjörður. The project, which became fully operational in 2007, involved extensive damming of rivers and created significant environmental debate both domestically and internationally.

History and background

The origins of the project are linked to early 21st-century industrial policy aimed at attracting foreign investment to Iceland. Following negotiations with the American corporation Alcoa, the Government of Iceland and Landsvirkjun approved plans for the power plant to supply the Fjardaál smelter. Preliminary studies and environmental impact assessments began in the late 1990s, facing immediate opposition from conservation groups. The Althing, Iceland's parliament, granted final approval in 2002 amidst considerable political contention. Construction, led by the Italian engineering firm Impregilo, commenced in 2003 and was a monumental logistical undertaking in the harsh terrain of the Icelandic Highlands.

Technical specifications

The facility is a complex system comprising several dams, reservoirs, tunnels, and a subterranean powerhouse. The centerpiece is the 198-meter tall Kárahnjúkastífla, a concrete-faced rockfill dam on the Jökulsá á Dal river, which is among the tallest of its type in Europe. A secondary dam, the Desjarárstífla, was built on the Jökulsá í Fljótsdal. A network of over 73 kilometers of headrace and tailrace tunnels channels water from the reservoirs to the underground power station at Kárahnjúkar. The station houses six Francis turbine units, each with a capacity of 115 MW, manufactured by the Austrian company Andritz. The combined reservoirs, including Hálslón, submerge a vast area of wilderness.

Environmental and social impact

The project precipitated one of Iceland's most intense environmental conflicts. The flooding of the Jökulsárgljúfur canyon and surrounding highland areas destroyed unique geological formations and altered fragile ecosystems. Conservation organizations like Icelandic Nature Conservation Association and international bodies such as World Wide Fund for Nature strongly criticized the development. The project also impacted reindeer habitats and Atlantic salmon runs in the affected watersheds. While proponents argued it utilized a domestic renewable energy source, opponents contended it caused irreversible damage to a pristine wilderness of global significance, sparking widespread protests and legal challenges.

Economic aspects and controversy

Economically, the project was justified as a catalyst for regional development in the Eastern Region, creating construction jobs and establishing a long-term industrial base with the Alcoa smelter. However, it became a symbol of the perceived over-expansion of Iceland's energy-intensive aluminium industry. Critics, including noted writer Andri Snær Magnason, argued it represented a "mega-project" mentality that prioritized heavy industry over sustainable development. The financial risks were later magnified by the 2008–2011 Icelandic financial crisis, which called into question the economic assumptions behind such large-scale foreign investments. The debate over Kárahnjúkar continues to influence Icelandic energy and environmental policy.

See also

* Energy in Iceland * List of power stations in Iceland * Environmental impact of reservoirs * Þjórsá and Tungnaá rivers * Icelandic environmentalism

Category:Dams in Iceland Category:Hydroelectric power stations in Iceland Category:Buildings and structures in Eastern Region (Iceland)